What is the order of work regarding floors, kitchen or walls?
Preferably wallpapering first, then the rest. A different order is possible in consultation. If you have a floor laid first, it must be covered with a protective floor covering. You can lay this yourself before we arrive, or ask us to do it. In general, we can work alongside a bathroom installer without any issues. We prefer not to have other companies/handymen around while we are working. This is related to the quality of work and the risks that arise when multiple parties are working at the same time.
